Waste Water Sample Projects
Meath Wastewater Treatment Plants Upgrade Contract
Location: Drumconrath WWTP
Plant upgrade including the design, installation, and commissioning of the following systems;
- Storm pumping and handling.
- Diffused aeration system.
- Sludge pumping, storage, and handling.
- Influent and effluent composite sampling.
- Flow monitoring.
- Control panels incorporating PLC and HMI’s.
- Automation of the works.
- Construction of a new access bridge to the treatment plant.
- All associated civil works required under the contract.
Meath Wastewater Treatment Plants Upgrade Contract
Location: Nobber WWTP
Plant upgrade including the design, installation, and commissioning of the following systems;
- Inlet screening & conveying
- Groundwater supply.
- Storm pumping and handling.
- Diffused aeration system.
- Sludge pumping, storage, and handling.
- Influent and effluent composite sampling.
- Flow monitoring.
- Control panels incorporating PLC and HMI’s.
- Automation of the works.
- All associated civil works required under the contract.
Location: Carlow CoCo
Aeration Wheel (Stahler) refurbishment. Complete wheel refurbishment including new Aerator segments, structural brackets, bearings sprockets, and chains.
Location: Kilbeggan, Westmeath
Installation of new aeration grid for Westmeath county council. To upgrade aeration tank efficiency. Confined space work. Tanks were drained and grids installed. Tanks refilled within a 24 hour period. Grids designed to be installed in one day and removable in one day without emptying the tank.